Project Experience_Presentaation
Selected project experience across Data Centre and industrial delivery, including coordinated CSA and MEP support, steel structures and specialist construction packages. The references below reflect a delivery model built around clear scope ownership, interface coordination, documented QA/QC and handover-ready outputs delivered on live, fast-track and mission-critical projects.
Client: TSL
Project: Data 4 Hanau | 300 MW Complex
Role: CSA Steelwork Subcontractor
- Design development and detailing
- Structural verification support
- Fabrication and delivery logistics
- Installation of façade interface steelwork
- Installation of gantry steel structures
- Installation of steelwork and grating systems for ventilation and technical shafts
- Installation of access platforms and walkways
- Installation of goalpost structures
- QA/QC documentation and inspections
- CSA/MEP interface coordination
- Fast-track delivery on a live mission-critical data centre project
Client: Winthrop Technologies
Project: SDC FKQ B1
Role: Subcontractor for selected MEP and CSA packages
- Fabrication, delivery and installation of 75 chiller drip trays
- Positioning and installation of chillers
- Installation of vibration isolators
- Installation of directional separation curtains between chillers
- Design, fabrication, delivery and installation of steel platforms between generator barriers
- Design, fabrication and installation of flood barriers
- Supporting steelwork and associated CSA works
Client:
Winthrop Technologies
Project:
WAW 03.2 EdgeConnex
Role:
CSA Steelwork & Metalwork | Office FitOut Subcontractor
- Secondary steelwork for generator and Data Hall areas
- Sandwich panel systems
- Ventilation louvres
- Mesh walls and partitions
- Slab reinforcement steelwork
- Fire-rated drywall partitions
- Fire stopping to existing and new openings
- Rooftop separation zones
- QA/QC documentation
- Installation coordination and handover
Client:
Mercury
Project:
WAW 04 Equinix
Role:
CSA Steelwork & Metalwork Subcontractor
- Design and installation of chiller canopies
- Air curtains between chillers
- Transformer room mesh cages
- Switchgear room duct protection
- Switchgear enclosure
- Structural steelwork
- Acoustic panel installations
- Sandwich wall systems
- QA/QC documentation
- Installation coordination and handover
Client:
Winthrop Technologies
Project:
WAW 02.2 EdgeConnex
Role:
CSA Steelwork & Metalwork Subcontractor
- Façade-related steelwork
- Secondary steelwork for generator and Data Hall areas
- ABB transformer enclosures
- COWL wall penetrations
- Fire-rated openings in sandwich panels
- CSA/MEP interface coordination
- QA/QC documentation
- Installation coordination and handover
Client:
Mercury | Holden
Project:
WAW 03 Microsoft
Role:
CSA Steelwork & Metalwork Subcontractor
- Design documentation
- Structural calculations
- Steel support frames for EI60 fire-rated doors
- Fabrication and installation of steel structures
- Installation of heavy-duty door support frames
- QA/QC documentation
- Installation coordination and handover
Client:
Winthrop Technologies
Project:
FRA 11 EdgeConnex
Role:
CSA Steelwork & Metalwork Subcontractor
- External drip trays for cooling units
- Internal drip trays for cooling equipment
- Drip trays for process pipework
- Generator fluid containment systems
- Leak protection solutions
- CSA/MEP interface coordination
- QA/QC documentation
- Installation coordination and handover
Client:
Winthrop Technologies
Project:
FRA 10 EdgeConnex
Role:
CSA Steelwork & Metalwork Subcontractor
- External drip trays for cooling units
- Internal drip trays for cooling equipment
- Drip trays for process pipework
- Generator fluid containment systems
- Leak protection solutions
- CSA/MEP interface coordination
- QA/QC documentation
- Installation coordination and handover
Client:
Winthrop Technologies
Project:
FRA 1 EdgeConnex
Role:
CSA Steelwork & Metalwork Subcontractor
- Drip tray systems for electrical rooms
- Design and prefabrication of drip trays
- Installation of drip tray systems
- Roof-level MEP plant enclosure steelwork
- Design, fabrication and installation
- CSA/MEP interface coordination
- QA/QC documentation
- Installation coordination and handover
Client:
Euroglas
Project: Budynek turbinowni z infrastrukturą
Role:
Contractor / Poland
- Reverse engineering and 3D laser scanning of the existing plant.
- Design adaptation to existing site conditions.
- Fabrication engineering for structural steel.
- Delivery engineering for structural steel and reinforced concrete works.
- Engineering for walls, roof systems, and underground infrastructure.
- Engineering for above-ground reinforced concrete infrastructure.
- Production-ready documentation for fabrication and installation.
- Technical support during fabrication and site execution.
- 3D site development modelling for construction planning.
Client:
PepsiCo
Project:
Technical Building | Poland
Role:
General Contractor
- Foundations and civil works
- Structural steel fabrication and installation
- Façade and roofing systems
- Entrance gates and access systems
- Power connection works
- Electrical distribution and containment
- Lighting and earthing systems
- QA/QC documentation
- Installation coordination and handover
lient:
Eurobox | Prinzhorn Group
Project:
Steam Boiler House 10 t/h
Role: General Contractor / Poland
- Design & Build delivery.
- Reverse engineering.
- CSA & Mechanical design.
- Multidisciplinary coordination.
- Pressure equipment approvals.
- Statutory inspections.
- Live plant execution.
- Zero production downtime.
- Phased boiler house replacement.
- Existing boiler relocated as backup.
Client:
IKEA
Project:
IKEA Warsaw | Targówek
Role:
General Contractor
- Reinforced concrete demolition and reconstruction
- Structural steel fabrication and installation
- 14 m high Promat fire-rated wall systems
- Concrete slab construction above live store areas
- Expansion joint sealing and floor joint systems
- Night works in an operational retail facility
- Specialist indoor lifting operations
- QA/QC documentation
- Installation coordination and handover
Client:
Cersanit
Project:
Heat Recovery System Expansion
Role:
General Contractor | Poland
- 3D laser scanning of the existing plant
- BIM engineering
- Pipework prefabrication
- Pipework installation
- Live plant coordination
- Delivery management
Client:
Globalworth
Project:
Hala Koszyki Modernisation | Poland
Role:
General Contractor
- Mezzanine extension and modernisation
- Structural steel extension
- Telecommunication system modifications
- Ventilation system modifications
- Night works in a live heritage building
- Construction sequencing and site coordination
- QA/QC documentation
- Installation coordination and handover
lient:
Various Industrial Clients
Project:
Process Technology Installation
Role: Contractor
- Installation of tunnel kilns and industrial dryers
- Installation of process mills
- Installation of belt conveyors and bucket elevators
- Mechanical installation of process equipment
- Machinery relocation and plant modifications
- Reverse engineering and engineering support
- Commissioning support
Client:
PepsiCo
Project:
Production Infrastructure | Poland
Role: General Contractor
- Reverse engineering and 3D laser scanning
- BIM modelling and detailing of technical and production access platforms
- Fabrication drawings and production documentation
- Fabrication of powder-coated, hot-dip galvanised and stainless steel access platforms for food production environments
- Delivery and installation of technical and production access platforms
- QA/QC documentation and inspections
- Final inspections, commissioning support and project handover
Client:
Grudzeń Las | Atlas Group
Project:
Quartz Sand Processing Plant
Role: Manufacturer
- Design, fabrication and installation of the structural steel support system for hydrocyclones
- Fabrication and installation of structural steel for a multi-level wet screening plant
- Installation of mineral wool sandwich panels
- Design, fabrication, delivery and installation of a 50 m belt conveyor for sand slurry
- Fabrication and delivery of a sand slurry dewatering unit
Client:
Various Industrial Clients
Project:
Industrial Machinery Manufacturing
Role: Manufacturer
- Process machinery manufacturing
- Belt conveyors and conveying systems
- Lifting beams, traverses and lifting equipment
- Silos with structural steel support systems
- Positioners and column lifting systems
- Belt reclaimers and dosing equipment
- Custom-engineered machinery for industrial production
Client:
Cersanit
Project:
Opoczno Production Facility
Role: Contractor | Poland
- Reverse engineering of process dust extraction cyclones
- 3D laser scanning and BIM modelling
- Reconstruction of fabrication documentation
- Fabrication of steel components
- Site installation and mechanical assembly
- Commissioning and operational start-up
Client:
Hutchinson
Project:
Storage Yard | Poland
Role:
General Contractor (Design & Build)
- Design documentation and permit support
- Administrative approvals
- Multi-layer pavement substructure
- Reinforced concrete yard slab
- Container guidance system
- Construction works and site coordination
- QA/QC documentation
- Handover and final approvals